Time impact wrench 1/2 18v, 785 nm, brushless, set with two batteries and charger
Goods available only in e-shop
441,10€
Delivery: home 3-4wd
ADD TO BASKET
1/2" brushless impact wrench with friction ring
It comes with a powerful engine that delivers up to 785 Nm of torque
Total length only 180 mm
4-mode control gives users the ability to move between four different speeds and torques for versatility
Features HD-SYNC™ technology for up to 20% more power when combined with our High Demand Pro Li-Ion PRO18V batteries
As part of the PRO18V system of professional power tools, this tool is compatible with all PRO18V batteries
Battery capacity (Ah) 4
Comes with 2 x 4.0 Ah batteries
Battery type Li-ion
Charger included 70 min
EAN code 4058546374587
Fuel gauge Yes
Impact rate (ipm) 0-3800
LED Yes
Max torque (Nm) 785
No load speed (rpm) 0 - 2800
Number of included batteries 2
Friction ring holding the socket
Sound power level (Lwa) (dB(A)) 110
Sound power level uncertainty (dB(A)) 3
Sound pressure level (Lpa) (dB(A)) 99
Uncertainty of sound pressure level (dB(A)) 3
Shipped in Kitbox
Vibration impact tightening of fasteners
maximum carrying capacity of the tool [m|s²]
16.7
Vibration impact tightening of fasteners
maximum carrying capacity of tool uncertainty [m|s²]
1.5
Weight with battery pack (EPTA) (kg) 2.37
It comes with a powerful engine that delivers up to 785 Nm of torque
Total length only 180 mm
4-mode control gives users the ability to move between four different speeds and torques for versatility
Features HD-SYNC™ technology for up to 20% more power when combined with our High Demand Pro Li-Ion PRO18V batteries
As part of the PRO18V system of professional power tools, this tool is compatible with all PRO18V batteries
Battery capacity (Ah) 4
Comes with 2 x 4.0 Ah batteries
Battery type Li-ion
Charger included 70 min
EAN code 4058546374587
Fuel gauge Yes
Impact rate (ipm) 0-3800
LED Yes
Max torque (Nm) 785
No load speed (rpm) 0 - 2800
Number of included batteries 2
Friction ring holding the socket
Sound power level (Lwa) (dB(A)) 110
Sound power level uncertainty (dB(A)) 3
Sound pressure level (Lpa) (dB(A)) 99
Uncertainty of sound pressure level (dB(A)) 3
Shipped in Kitbox
Vibration impact tightening of fasteners
maximum carrying capacity of the tool [m|s²]
16.7
Vibration impact tightening of fasteners
maximum carrying capacity of tool uncertainty [m|s²]
1.5
Weight with battery pack (EPTA) (kg) 2.37
463,50€
ADD TO BASKET
Delivery: home 3-4wd
442,80€
ADD TO BASKET
Delivery: home 3-4wd
89,00€
ADD TO BASKET
Delivery: home 3-4wd
60,40€
ADD TO BASKET
Delivery: home 3-4wd
56,60€
59,50€
-5%
ADD TO BASKET
Delivery: home 3-4wd
132,20€
154,60€
-15%
ADD TO BASKET
Delivery: home 3-4wd