Time impact wrench 1/2, 18v, 785nm, brushless, without battery and charger

 

$237,30
Arrives in 3-4wd
ADD TO BASKET
Products ID: 1125676
Partnumber: 4935479663
Brand: AEG
https://i.ak24.ee/mf/medium/aeg.jpg
1/2" brushless impact wrench with friction ring
It comes with a powerful engine that delivers up to 785 Nm of torque
Total length only 180 mm
4-mode control gives users the ability to move between four different speeds and torques for versatility
Features HD-SYNC™ technology for up to 20% more power when combined with our High Demand Pro Li-Ion PRO18V batteries
As part of the PRO18V system of professional power tools, this tool is compatible with all PRO18V batteries

Battery capacity (Ah) -
Battery included -
Battery type Li-ion
Charger included No charger
equipped
EAN code 4058546374570
Fuel gauge Yes
Impact rate (ipm) 0-3800
Max torque (Nm) 785
No load speed (rpm) 0 - 2800
Number of batteries supplied 0
Friction ring holding the socket
Sound power level (Lwa) (dB(A)) 110
Sound power level uncertainty (dB(A)) LWA=110.0 dB
(A) / KWA = 3
dB(A)
Sound pressure level (Lpa) (dB(A)) 99
Sound pressure level uncertainty (dB(A)) LpA=99.0 dB (A) /
KpA = 3 dB(A)
Speed ​​settings 4
Delivered in a gift box
Vibration impact tightening of fasteners
maximum carrying capacity of the tool [m|s²]
16.7
Vibration impact tightening of fasteners
maximum carrying capacity of tool uncertainty [m|s²]
1.5
Voltage (V) 18
weight (including battery) (EPTA) (kg) 2.1

AEG

time – German engineering wisdom since 1887

AEG (Allgemeine Elektritäts-Gesellschaft) is one of Germany's oldest and most recognized brands, with a history dating back to 1887. AEG is known for its innovative technology, reliability and modern design. The brand specializes primarily in household appliances, power tools and industrial electronics.

Delivery method

DHL Express
Fast Delivery (Shipping discount for order starting from 700 € or $)
$34,70
Delivery date 2025-06-12
Postal office
To the nearest Postal office
$44,10
Delivery date 2025-06-25
Courier International
To Home or Office (Shipping discount for order starting from 700 € or $)
$64,60
Delivery date 2025-06-25

Which hand tool steel is the most durable?

Which hand tool steel is the most durable? As we all know, different steels are used to make different hand tools. The properties and strength of the steels are given below. ... More...