Time impact wrench 18v, 350nm, without battery and charger

 

$145,90
Arrives in 3-4wd
ADD TO BASKET
Products ID: 1118193
Partnumber: 4935478940
Brand: AEG
https://i.ak24.ee/mf/medium/aeg.jpg
18V brushless
BSS 18C3B3

The compact and powerful brushless motor provides up to 350 Nm of torque
The 3-speed transmission provides ultimate controllability in all applications
1/4" Hex reception
Only 139mm long: allows the tool to fit into tight spaces
Lightweight tool, weighs only 1.4 kg with PRO18V 2.0 Ah battery
PRO18V system compatibility

Battery capacity (Ah) -
Battery included -
Battery type Li-ion
EAN code 4058546362225
Impact rate (ipm) 0-4200
LED Yes
Max torque (Nm) 350
No load speed (rpm) 0 - 2900
Number of batteries supplied 0
Delivered in a gift box
Voltage (V) 18
Weight with battery pack (EPTA) (kg) 1.4

AEG

time – German engineering wisdom since 1887

AEG (Allgemeine Elektritäts-Gesellschaft) is one of Germany's oldest and most recognized brands, with a history dating back to 1887. AEG is known for its innovative technology, reliability and modern design. The brand specializes primarily in household appliances, power tools and industrial electronics.

Delivery method

DHL Express
Fast Delivery (Shipping discount for order starting from 700 € or $)
$29,00
Delivery date 2025-06-12
Postal office
To the nearest Postal office
$34,10
Delivery date 2025-06-25
To nearest Postal office
Economy (Max 2kg ,60cm)
$25,80
Delivery date 2025-06-25
Courier International
To Home or Office (Shipping discount for order starting from 700 € or $)
$55,20
Delivery date 2025-06-25

Which hand tool steel is the most durable?

Which hand tool steel is the most durable? As we all know, different steels are used to make different hand tools. The properties and strength of the steels are given below. ... More...